Facilities
We are woking to provide stably good products and meet demands for lower costs and shoter delivery times, manufacturing in a continuous process from tube making to secondary working at our own plant.
Main facilities
| Tubing machine | 21 | cutter by grinding wheel | 12 |
| Drawing machine | 18 | Chamfering machine | 15 |
| Continuous drawing machine | 2 | Center-less grinding machine | 6 |
| Straightener | 12 | Polishing machine | 10 |
| Annealing furnace | 2 (4 lines/one) | Barrel machine | 7 |
| Automatic lathe | 25 | Other working machine | a lot |
Process
![]() |
Tubing |
|---|---|
![]() |
Drawing |
![]() |
Annealing |
![]() |
Straightening |
![]() |
Cutting |
![]() |
Secondary working |
![]() |
Inspecting |
![]() |
Shipping |









